Working Capital for Construction Companies
Construction runs on a structural mismatch: you pay subs and suppliers on 30-day terms while the owner pays draws 45 to 60 days after a pay application that itself lags the work by weeks. Add 5-10% retainage held until closeout and a profitable contractor can be cash-negative on a job that is going perfectly. Growth makes it worse, because every additional job widens the same gap.
Working capital for construction companies bridging the gap between performing work and receiving the draw. Cover subs, materials, and retainage. $100K-$15M.
Get a structure for this situation
Two quick steps. An advisor responds within 24-48 hours.
You are probably here because
How we structure it
What we need to give you an answer
Have these together and you will know where you stand in 24-48 hours instead of three weeks.
Six simultaneous jobs and a widening retainage balance
A mechanical subcontractor in Colorado was running six jobs at once with $1.9M in combined progress billings outstanding and $640,000 held in retainage. Every additional award made cash worse, not better. Their bank line was $750,000 and fully drawn. We put a $2.5M revolving facility in place, advancing against approved pay applications with retainage evaluated separately at a lower advance rate. The contractor took on two additional jobs the same quarter and stopped paying subs late.
Questions we get
Tell us the situation and the number
A capital advisor will respond within 24-48 hours with a realistic structure, not a rate teaser.